Gordian Logo RSMeans Data from Gordian

Blog

Placeholder

August 14, 2014

Anyone reading over a Job Order Contracting Price Proposal should walk away with a clear understanding of the work that will be completed. The Price Proposal should be a reflection of the Detailed Scope of Work, and include all tasks required to complete the project. Sometimes, items that need to be included are inadvertently left off of Price Proposals. Here are 4 items commonly left off Price Proposals that need to be included:

  1. Mobilization for rental equipment, such as pavers, rollers, cranes, etc.
  2. Minimum set up charges for tasks, such as core drilling, saw cutting, cutouts, etc.

Placeholder

July 17, 2014

Do you keep boxes upon boxes of fluorescent lamps and ballasts in storage for your facilities? Does your maintenance staff invest hours upon hours troubleshooting fluorescent fixtures? Does your HVAC system need a break from competing with heat emitting ballasts? If you answered yes to any of these questions, then LEDs or Light Emitting Diodes may be a fit for your facility and your maintenance/operating budget.

Placeholder

June 26, 2014

Many times in construction the word “transparency” is tossed around very loosely.  At times a contractor can provide a brief scope of work with a lump sum price or just a lump sum price.  Or, a contractor will reference a set of prints in their lump sum proposal in which the problem is that sometimes the prints may not provide enough detail of what a contractor should or should not provide. For example, a print may say that the electrical contractor shall provide a 2” EMT Conduit from Panel A to Panel B.  The problem is that the print nor the contractor’s lump sum price spells out how that conduit is to be support, or routed.  This reflects a lack in transparency, which may lead to confusion during a review by the owner that could result in the owner being vulnerable to additional costs associated with the project.  Transparency is a tool that a detailed, localized unit price book, such as the Construction Task Catalog® (CTC), provides that allows the owner to remain protected from being a victim or being taken advantage of by discrepancies.

When using any of Gordian’s JOC solutions the contractor is building a Price Proposal based on a CTC.  Building a proposal from Gordian’s CTC is like providing to an owner a contractors “take-off” sheet. 

Job Order Contracting Basics: Benefits for Contractors

Challenges in the Military’s Move to Net Zero

Gordian’s Assessment Options: Modeled Assessment

Three Big Stories From the Q3 Construction Cost Insights Report 

Subscribe to the Building Matters Newsletter

x
Gordian Job Order Contracting - Project Entry
Start Your Project in Three Easy Steps

Identify your project. Fill out a quick form. Get started with our Gordian JOC experts.

Enter Your Project Now
Scroll to Top